Building Pads in Burleson, TX
Our Services

Building Pads in Burleson, TX

Building Pads · Burleson, TX

Pads built to the elevations on your plan

Building pads are part of the dirt work we do around Burleson and the Fort Worth area. A house pad, a shop pad, a barn pad or a manufactured home pad all start the same way. We stake the footprint from the plan, then move dirt until the pad sits at the right elevation. Some pads come out of the dirt already on the lot, and some need fill hauled in.

Texas Best Demolition runs demolition and dirt work out of Burleson, TX, with about 20 people on staff. The company launched in late 2024, and decades of demolition and dirt work sit behind it. Right now 17 to 18 house demolitions run at once, plus commercial work and a very large ranch pond. Estimates are free, so show us the plan and we will price the pad at the property.

What We Handle

  • House pads for new homes
  • Shop and barn building pads
  • Mobile home and manufactured home pads
  • RV pads and small commercial pads
  • Cut and fill from on site dirt
  • Select fill hauled in by load
  • Fill placed in lifts and compacted
  • Pad grade held to the plan

Free Building Pads Quote

Tell us about your project and we will get right back to you.

Pads We Build Across Burleson and Fort Worth

Most of our pad work is a house pad for a home built on a slab. Shop and barn pads come next, under metal buildings and barndominiums. Mobile home and manufactured home pads come up often out on the county acreage. RV pads and small commercial pads come through as well. When an old trailer has to come off first, pulling the trailer and cleaning the pad is our work too.

A pad gets built one of two ways, and the lot decides which. On a lot with dirt to spare, we cut the high spots and fill the low ones. When the site runs short, fill dirt and select fill ride in on our own trailers. Either way the finished elevation comes off the plan. The ground around the pad gets shaped at the same time, so water leaves the building.

How is a house pad built?

The footprint gets staked from the plan first, so everybody works off the same lines. Topsoil and roots come off next, because that layer is too soft to build on. On a lot grown up in brush, clearing the trees and stumps out happens before the pad work starts. Then the high spots get cut and the low spots get filled until the shape matches the plan.

Fill goes down in layers called lifts, and each lift gets packed before the next one lands. TxDOT Item 132 holds a layer to 16 inches loose or 12 inches compacted under density control. A padfoot roller or a dozer track does the packing, and clay gets watered first so it packs. The pad runs past the slab edge, and the finish grade is held to the plan. When the plan calls for density testing, the builder's lab runs it.

What is a house pad made of, and how much dirt does it take?

Common fill dirt handles volume, and select fill is what a plan calls for under a pad. TxDOT Item 132 holds Type A fill to a liquid limit of 45 and a plasticity index of 15. Low plasticity matters here because Tarrant and Johnson County clay swells wet and shrinks dry. A pad built out of high plasticity clay keeps moving under the slab season after season. Our cut and fill work on the lot uses the dirt you already own where the plan allows it.

The yardage math is length times width times depth in feet, divided by 27. A 60 by 40 pad with a foot of fill runs about 89 cubic yards by that rough math. Packing shrinks loose dirt, so the real order comes out higher than the paper number. Fill comes from a pit, or from spoil already sitting on the place. On acreage, a new stock tank or ranch pond dig can make most of the dirt a pad needs.

Do I need a permit or an engineer for a building pad in Fort Worth or Johnson County?

Inside the city, a building pad on a Fort Worth lot follows the city's grading rules. A grading permit is required for land disturbing activity impacting one acre or more. The city also requires an approved fill permit before fill material goes down, under Ordinance 15789, and fill used for landscaping on improved property is exempt. Registering a fill site costs $150, and fill within 50 feet of existing trees brings urban forestry in. Fill on a pad site cannot rise more than three feet above the highest elevation around the adjacent lots.

The design belongs to the builder and the engineer, and we build what they draw. Fort Worth amends the residential code so every foundation and footing is designed and sealed by a Texas registered engineer. Under a slab that code limits earth fill to 8 inches unless the design approves more. Inside Burleson a notification of grading goes to the city, and grading has to follow city ordinance B652. Out in unincorporated Johnson County the county handles development and floodplain items instead.

Padfoot roller compacting loose dirt across a wide, freshly graded building site with a low pile of dirt and trees in the distance Dozer pushing a pile of red clay across a new house pad, with a newly built two story house and a pickup truck behind it

Ready to get started?

Free, no-obligation estimates across Burleson, Fort Worth & the southwest Metroplex.

(817) 564-4360
What You Can Expect

How a Job With Texas Best Runs

From the first look at the job to the final walk-through, here is exactly how it goes.

1

Call and Tell Us the Job

Call (817) 564-4360 or send the form. Tell us the address, what has to come down or what dirt has to move, and your timeline. We set a time to come look.

2

Free On-Site Estimate

We price the job standing on the property, not over the phone. The number covers the whole job, including haul-off, and we tell you what has to happen before work can start.

3

Utilities, Permits, Schedule

Utility disconnects get ordered, the demolition permit gets handled, and any required survey gets lined up. The start date builds around those dates, and we keep you posted.

4

Teardown, Haul-Off, Grade

The machines do the work, the debris leaves in our own dumpsters, and the ground gets graded before we pull off. What you keep is a clean, usable lot.

FAQ

Building Pads Questions, Answered

Common questions about building pads across Burleson, Fort Worth & the southwest Metroplex. Don't see yours? Give us a call and ask.

Call (817) 564-4360

How much does a building pad cost?
Cost tracks how much dirt has to move and where that dirt comes from. The closest published number is land grading, which Thumbtack puts at $1,040 to $3,486 across the country, with most people paying around $1,897. A pad that needs hauled-in fill runs above that, since Thumbtack puts the dirt itself at $8 to $15 per cubic yard before it gets spread. We price the pad standing on the property, and the estimate is free.
How thick does a house pad need to be?
The plan sets the thickness, and it changes with the lot. The residential code Fort Worth uses caps fill under a slab at 24 inches for clean sand or gravel. For earth the cap is 8 inches, except where the design approves more. Deeper than that is engineered fill, designed by the builder's engineer and tested by a lab.
How many loads of dirt does a house pad take?
Start with the yardage. Length times width times depth in feet, divided by 27, gives cubic yards. A 40 by 30 shop pad with 8 inches of fill lands near 30 cubic yards by that rough math. Load counts depend on the trailer size, and we give you that number at the estimate.
What is the difference between a building pad and a slab?
The pad is the dirt, and the slab is the concrete poured on top of it. We build the pad and compact it to the elevation on the plan. The concrete crew forms and pours the slab after we pull off. A pad that holds its grade is what a slab needs under it.
Do you compact the pad?
Yes, fill goes down in lifts and each lift gets packed before the next one lands. TxDOT Item 132 caps a compacted layer at 12 inches, or 16 inches while it is still loose. That same spec asks for at least 98 percent of maximum dry density on low plasticity fill. When the plan calls for density testing, the builder's lab runs it.
Can you build an RV pad or a mobile home pad?
Yes, both are regular work for us around Burleson and out across Johnson County. An RV pad wants a firm, level surface with water running off it instead of standing. A manufactured home pad gets built to the setup elevation and the tie down layout. We build the pad, and the set crew handles the home itself.
More From Texas Best

Explore Our Other Services

Grading and Site Prep in Burleson, TX

Grading and Site Prep

We grade lots and prep sites around Burleson and the Fort Worth area. Our dozers and loaders shape the ground so water runs away from the slab.

Fill Dirt and Hauling in Burleson, TX

Fill Dirt and Hauling

We deliver fill dirt across Burleson and Fort Worth, spread and compact it with our machines, and haul dirt off your site.

Excavation and Dirt Work in Burleson, TX

Excavation and Dirt Work

We handle dirt work across Burleson and the Fort Worth area. Cut and fill, trenching, foundation digs, and hauling with our own trucks and trailers.

Why Choose Texas Best

Why Fort Worth-Area Property Owners Call Texas Best

Decades in the Work

A demolition company was built and sold here before this one. The company is new; the experience running it is not. About 20 people keep 17-18 house demos moving at once.

A Machine for Every Job

A Bobcat E88 fits through a backyard gate. A Kobelco 350 brings down a commercial building. Dozers, wheel loaders and skid steers fill the gaps, so the machine matches the lot.

Haul-Off Is Ours Too

Three roll-off trucks and about 75 dumpsters belong to the company. Debris leaves on our schedule, and the quote covers the finished state: teardown, loading, hauling, cleanup.

Southwest Metroplex Ground

Burleson is home. Fort Worth, Arlington, Crowley, Mansfield and Cleburne are short drives on known ground. The clay moves around here, and the dirt work is planned for it.

Guides & Resources

Building Pads Guides

Ready to Start Your Project?

Get In Touch With Texas Best Demolition

A house or building that needs to come down, a slab or pool that needs to come out, dirt that needs to move? Call or send the form and we will look at the job with you and price the whole thing, teardown through cleanup. The estimate is free.

Get a Free Estimate

Tell us about your project and we will get right back to you.

Call (817) 564-4360